Executive Summary
Purpose of this Report

List of Terms and Abbreviations

1. Introduction
1.1 Proposed Structure of the IA

2. Method statement
2.1 Overall approach
2.1.1 Introduction
2.1.2 The development of the RBMP
2.1.3 The link between the RBMP, the IA and the SEA
2.2 Definition of policy options
2.2.1 Baseline
2.2.2 'Draft RBMP'
2.2.3 ' RBMP - Closing the gap'
2.3 Methodology for benefit and cost assessment
2.3.1 Introduction
2.4 Approach to cost assessment
2.4.1 Cost elements
2.4.2 Cost assessment
2.5 Approach to benefit assessment
2.5.1 Assessment of WFD water benefits
2.5.2 Implications for the wider management of the water environment
2.5.3 Other environment and social benefits
2.6 Methods for cost assessment by main pressure and sector
2.6.1 Diffuse pollution - agriculture
2.6.2 Diffuse pollution - forestry
2.6.3 Diffuse pollution - urban runoff
2.6.4 Point sources - water industry
2.6.5 Point sources - aquaculture
2.6.6 Point Sources - Manufacturing Industries
2.6.7 Point sources - mining and quarrying
2.6.8 Abstraction, flow regulation and morphological changes - electricity generation
2.6.9 Abstraction, flow regulation and morphological changes - public water supply
2.6.10 Morphology - historical engineering and urban development
2.6.11 Invasive alien species
2.7 Method to Cost Requirements of CAR and the draft RBMPs
2.8 Methodology to cost Options
2.9 Distribution of costs

3. Work plan
3.1 Stage 2
3.1.1 Agree table of contents for IA report and technical documentation reports.
3.1.2 Confirm SEPA time table and progress on RBMP
3.1.3 Develop unit costs for policy/delivery mechanisms
3.1.4 Develop unit costs for measures by pressure and sector
3.1.5 Delivery mechanism and measures to be included in policy options
3.1.6 Assess costs of mechanisms and measures
3.1.7 Assess benefits of mechanism and measures
3.1.8 Describe distribution of costs and benefits
3.1.9 How might these costs and benefits affect competition in the sector
3.1.10 Assess administrative costs and impacts on the Scottish Government
3.2 Stage 3 Reporting
3.2.1 Prepare IA summary report
3.2.2 Prepare technical documentation report

4. Time table by task

Appendix A Detailed list of measures by option
Appendix B Table of Content for Summary report
Appendix C Proposed table of contents for Technical Report
Appendix D Summary of information relevant to the Solway Tweed RBD

Report for
Jean Erbacher
Scottish Government

Main Contributors
Michael Sorensen
Richard Church
Simon Clarke
Ilona Kirhensteine

Issued by
Richard Church

Approved by
Simon Clarke

Entec UK Limited
6/7 Newton Terrace
Glasgow
G3 7PJ
Scotland

Tel: +44 (0) 141 222 1200
Fax: +44 (0) 141 222 1210

Doc Reg No.
h:\projects\hm-255\21000-projects\21953 scot ria sub-file\rr014i2 (stage23 scoping report_version to send 020408).doc

Disclaimer

This report has been prepared in a working draft form and has not been finalised or formally reviewed. As such it should be taken as an indication only of the material and conclusions that will form the final report. Any calculations or findings presented here may be changed or altered and should not be taken to reflect Entec's opinions or conclusions.

Copyright and Non-Disclosure Notice

The contents and layout of this report are subject to copyright owned by Entec (© Entec UK Limited 2008) save to the extent that copyright has been legally assigned by us to another party or is used by Entec under licence. To the extent that we own the copyright in this report, it may not be copied or used without our prior written agreement for any purpose other than the purpose indicated in this report.

The methodology (if any) contained in this report is provided to you in confidence and must not be disclosed or copied to third parties without the prior written agreement of Entec. Disclosure of that information may constitute an actionable breach of confidence or may otherwise prejudice our commercial interests. Any third party who obtains access to this report by any means will, in any event, be subject to the Third Party Disclaimer set out below.

Third Party Disclaimer

Any disclosure of this report to a third party is subject to this disclaimer. The report was prepared by Entec at the instruction of, and for use by, our client named on the front of the report. It does not in any way constitute advice to any third party who is able to access it by any means. Entec excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability.

Document Revisions (

No.

Details

Date

i1

Revised document

14/3/08

i2

Revised Document

02/04/08

March 2008