Scotland Rural Development Programme 2007-2013

Listen

OPTION 51: ANIMAL HEALTH AND WELFARE MANAGEMENT PROGRAMME

Minimum annual payment: AHWM Plan only

£260.00

Maximum annual payment: Plan plus all voluntary options

£1,320.00

COMPULSORY ACTIONS: AHWM Plan

Implement a proactive scheme for the use of treatments, including guidance on the use of veterinary advice and treatment.

Skilled farm labour (hrs)

5

@ £7.82/hr

£39.10

Farm management (hrs)

2

@ £9.18/hr

£18.36

Veterinary time (hrs)

3

@ £61.58/hr

£184.74

Sub Total

£242.20

75% contribution

£181.65

Implement a proactive scheme for the use of vaccines and routine medications.

Skilled farm labour (hrs)

5

@ £7.82/hr

£39.10

Farm management (hrs)

1

@ £9.18/hr

£9.18

Veterinary time (hrs)

1

@ £61.58/hr

£61.58

Sub Total

£109.86

75% contribution

£82.40

75% of Total costs

£264.05

Proposed annual standard cost for AHWM Plan

£260.00

VOLUNTARY OPTIONS

Benchmarking - Undertake additional inspection and monitoring to collate performance indicators and analyse all significant animal health and welfare related observations arising from inspections and implement an action plan to measure performance.

Skilled farm labour (hrs)

53

@ £7.82/hr

£414.46

Farm management (hrs)

1

@ £9.18/hr

£9.18

Veterinary time (hrs)

2

@ £61.58/hr

£123.16

Sub Total

£546.80

75% contribution

£410.10

Proposed annual standard cost for benchmarking

£410.00

Biosecurity - Produce a biosecurity plan to ensure the safe integration of new stock on farm.

Skilled farm labour (hrs)

0

@ £7.82/hr

£0.00

Farm management (hrs)

7

@ £9.18/hr

£64.26

Veterinary time (hrs)

0

@ £61.58/hr

£0.00

Sub Total

£64.26

75% contribution

£48.20

Minimise the risk of spreading disease by maintaining fences around isolation areas to enhance biosecurity levels and to prevent diseases from entering the herd/flock.

Materials (/m)

@ £1.50

Labour (/m)

@ £1.60

Cost of new fence (/m)

£3.10

20yr Maintenance cost (/m)*

£3.10

Annual maintenance cost (/m)

£0.16

75% contribution (/m)

£0.12

Proposed standard cost for biosecurity plan (one off)

£50.00

Proposed annual standard cost for fence maintenance per metre

£0.10

Maximum annual standard cost for maintaining 3000m fence

£300.00

Sampling - On the advice of the veterinary surgeon to undertake sampling to identify diseases / conditions such as twin lamb disease or copper deficiency, which may be present on farm having a negative impact on animal health and welfare and take informed control measures to address conditions .

Skilled farm labour (hrs)

5

@ £7.82/hr

£39.10

Farm management (hrs)

1

@ £9.18/hr

£9.18

Veterinary time (hrs)

3

@ £61.58/hr

£184.74

Sub Total

£233.02

75% contribution

£174.77

Proposed annual standard cost for sampling

£170.00

Forage Analysis - Analyse forages and obtain professional nutritional advice and implement advice from report.

Skilled farm labour (hrs)

5

@ £7.82/hr

£39.10

Farm management (hrs)

1

@ £9.18/hr

£9.18

Veterinary/Advisor time (hrs)

2

@ £61.58/hr

£123.16

Sub Total

£171.44

75% contribution

£128.58

Proposed annual standard cost for forage analysis

£130.00

Based on average livestock figures from June 2003 Census of 74 cattle and 299 sheep equivalent to 120 livestock units.
One cow is 1 LU, one sheep is 0.15 LU

Skilled farm labour costed at £7.82/hour (current agreed rate)
Farm management costed at £9.18/hour (current agreed rate)
Veterinary time costed at £61.58/hour ( BVA rate 2006)
Fence materials costed at £1.50 per running metre, labour costed at £1.60 per running metre ( SAC Farm Management Handbook 2004/2005)

* For maintenance, expect to wire/re-stob 50% of fence over 10 years; expect fence to last 20 years, so total lifetime maintenance cost equals cost of new fence.

Page updated: Friday, July 20, 2007