SPP 6: Renewable Energy Consultative Draft: Strategic Environmental Assessment: Environmental Report

Listen

Published by the Scottish Executive, August, 2006

This document is also available in pdf format (1.9MB)

Contents

1 Introduction
1.1 Background
1.2 Strategic Environmental Assessment
1.3 Structure of this Report

2 Scottish Planning Policy 6
2.1 The Need for SPP 6
2.2 SPP 6 Development and Preparation
2.3 SPP 6 Objectives and Outline

3 Sea Approach and Methodology
3.1 Introduction
3.2 Sea Approach
3.3 Scope of the Sea
3.4 Assessment Methodology
3.5 Consultation

4 Baseline and Sea Objectives
4.1 Introduction
4.2 Existing and Future Baseline Conditions
4.3 Other Plans and Programmes
4.4 Environmental Problems
4.5 Formulation of Sea Objectives

5 Development of Options
5.1 Background
5.2 Policy Options
5.3 Policy Outcomes
5.4 Environmental Assessment of Policy Options

6 Assessment of Environmental Effects
6.1 Background
6.2 Mitigation
6.3 Assessment Summary
6.4 Monitoring
6.5 Next Steps

Appendices

Appendix A - Consultation Responses Summary
Appendix B - EAFRE Members
Appendix C - Baseline Data
Appendix D - Archaeological Data
Appendix E - Relevant Plans, Programmes and Environmental Objectives and their Relationship with the Draft SPP 6
Appendix F - Policy Option Appraisal Tables (Options A to E)
Appendix G - Draft SPP 6 Appraisal Table

Page updated: Monday, August 14, 2006