Proposed EU Directive on the Management of Waste from the Extractive Industries

Listen

Proposed EU Directive on the Management of Waste from the Extractive Industries

TABLE 8

INDICATIVE COST PER TONNE OF GUARANTEES

Annual cost of guarantee ()

Annual output
(thousand tonnes)

Annual cost
per tonne ()

China clay

1,000,000

2,400

0.42

Fluorspar

7,000

50

0.14

Limestone

40,000

1,500

0.03

Opencast coal

98,000

400

0.25

Sand & gravel

1,000

250

0.00

Slate

10,000

900

0.01

Source: GHK Case Studies

TABLE 9

THE UK EXTRACTIVE INDUSTRY, 2001

Type of Mineral

Units

England

Wales

Scotland

N Ireland

UK

Total industry

No. Sites

1,580

155

320

140

2,195

Output
(1000 tonnes)

253,710

26,719

44,039

37,623

362,091

Construction minerals

No. Sites

1,039

116

250

122

1,527

Output
(1000 tonnes)

186,513

24,168

34,914

20,935

266,530

Total (ex construction)

No. Sites

541

39

70

18

668

Output
(1000 tonnes)

67,197

2,551

9,125

16,688

95,561

Of which:

Energy minerals

No Sites

96

19

18

12

145

Output
(1000 tonnes)

20,600

2,200

7,800

13,412

44,012

Industrial minerals

Sites

445

20

52

6

523

Output
(1000 tonnes)

46,597

351

1,325

3,276

51,549

Total (ex-construction) in need of a site Guarantee (estimated)

Sites

429

20

42

9

500

Output
(1000 tonnes)

48,117

906

3,268

6,972

59,263

Source: GHK - based on data from UK Minerals Yearbook 2001

Page updated: Thursday, May 25, 2006