Register to receive email news alerts, daily digest, weekly roundup or Topic newsletters.
Listen
This document is also available in pdf format (835k)
1. General 1.1 Introduction 1.2 Background 1.3 Objectives 2. Notices and Instructions 2.1 Introduction 2.2 Purpose 2.3 Scope 2.4 Submission of Tenders 2.5 Communication During Tender Period 2.6 Definitions, Interpretations and Abbreviations 2.7 Information Disclaimer 2.8 Compliance Statement 2.9 Deeds of Indemnity/Guarantee 2.10 Subsidy 2.11 Variations 2.12 Vessels 2.13 Ports, Quayside and Terminal Facilities 2.14 Maintenance 2.15 Contracts with VesCo 2.16 Consultation between VesCo and the Contractor 2.17 Constraints, Risks and other key points to note Fares TUPE Pensions Consultation with Users Performance Regime Financial Guarantee Clawback Payments 2.18 Contract and Compliance Legal Jurisdiction Compliance with EC and Domestic Law 2.19 Monitoring and Audit 2.20 Quality Assurance 2.21 Contract Duration 2.22 Default Arrangements 2.23 Material Change 2.24 Relief Events 2.25 Termination 2.26 Transfer or Assignation 2.27 Insurance 2.28 Disputes 2.29 Financial Structure 2.30 Allocation of Costs 2.31 Transparency 2.32 Allocation of Responsibility 2.33 Clawback 3. Service Specification 3.1 Introduction 3.2 Minimum Service Level 3.3 Relief Vessels 3.4 Timetables Approved Service Revisions Unscheduled Special Events Emergency Services Provision Above the Minimum Level of Service Fares Structure Escalation Arrangements Concessionary Fares 3.5 Brand and Marketing 3.6 Service Vessels and Safety 3.7 Integrated Transport, Ticketing and Information 3.8 Traveline 3.9 Ship Boarding Practices 3.10 Network Services and Products 3.11 On Board Facilities 3.12 Language 3.13 Consultation with Users 3.14 Clyde Shipping Services Advisory Committee 3.15 Utilisation of Port Assets 3.16 Performance Regime and Users' Charter 3.17 Monitoring of Operations 3.18 Safety 3.19 Ports and Safety 3.20 Information Required from Contractors over the Course of the Five Year Contract 4. Bidding Process and Evaluation of Bids 4.1 Timetable for Tendering 4.2 Guidelines for Submitting a Compliant Bid 4.3 Communication During Tender Period 4.4 Price Structure and Tariffs Proposed Schedule Operational Management Plan 4.5 Tender Documentation Vessel Specification Quality Plan Key minimum standards Environmental Considerations Security Implementation Plan 4.6 Financial Arrangements and Subsidy Terms 4.7 Handover Procedure 4.8 Costed Bid Stage 4.9 Additional Notices and Instructions Annex 1 - Analysed Carrying StatisticsAnnex 2 - Summer Timetable and Fares 2003Annex 3 - Winter Timetable and Fares 2002/03Annex 4 - Table of Rates, Fares And ChargesAnnex 5 - Concessionary Fares and Other Special Charging ArrangementsAnnex 6 - Prescribed Support ServicesAnnex 7 - Ownership, Facilities and Arrangements at Gourock and Dunoon HarboursAnnex 8 - Membership and Remit of the Clyde Shipping Services Advisory CommitteeAnnex 9 - Summary of Performance Standards RequiredAnnex 10 - Information which the Operator will be Required to ProvideAnnex 11 - Tender Documentation: Supporting Material Required
Page updated: Thursday, May 25, 2006